GENERATOR HIRE FOR TELFORD HOMES, LONDON

Power You Can Trust

GENERATOR HIRE FOR TELFORD HOMES, LONDON

INTRODUCTION

Telford Homes are a leading London-focused residential and mixed-use property developer. They specialise in creating, designing, and building innovative landmark developments in some of the most desirable and sought-after locations in the capital. Over the past 18 months, WB Power Services have been working with Telford Homes to provide a flexible, bespoke temporary generator hire agreement.

PROJECT OVERVIEW

LONG TERM RELATIONSHIP

As part of our hire agreement with Telford Homes, our generator sets have been procured on long-term contracts

MULTI-SITE

Across London, WB Power have deployed equipment to 5 Telford Homes construction sites

MULTI SIZE POWER SOLUTION

Across the 5 Telford Homes sites, WBPS have deployed over 36 generator sets, ranging from 200kVA to 550kVA

OVERVIEW OF WORKS

Telford Homes are a leading London-focused residential and mixed use property developer. They specialise in creating, designing and building innovative landmark developments in some of the most desirable and sought-after locations in the capital. Over the past 18 months, WB Power Services have been working with Telford Homes to provide a flexible, bespoke temporary generator hire agreement. As part of the agreement, WB Power have deployed 36 generator sets across 5 Telford Homes construction sites, ranging from 200kVA to 550kVA.

 

DEPLOYING A WIDE RANGE OF DIESEL AND HYBRID GENERATORS ON BESPOKE, FLEXIBLE CONTRACTS

OVERVIEW OF WORKS UNDERTAKEN

WORKS UNDERTAKEN

As part of their hire agreement, WB Power have provided a cost effective, flexible solution to fulfil the temporary power needs of 5 construction sites, powering both construction site accommodation and tower cranes. Further details include:

  • 36 generator sets deployed since implementation
  • Sizing from 200-550kVA
  • 5 sites across London from Greenford to Walthamstow
  • Long term hire agreements; ranging from 2 to 5 years

WORKING TOGETHER TO BUILD A BETTER FUTURE

WB Power are incredibly proud to be working with Telford Homes, who take their sustainability responsibility seriously, and have pledged to become a net zero carbon company from 2030. Most recently, WB Power have been working closely with Telford Homes on a number of sustainability initiatives. Our team attended an event hosted by the Sustainability School, taking part in a seminar entitled ‘Working towards cleaner air: how the plant community is actively tackling air quality and climate change impacts.’