Plant Room

6MVA Diesel Generator Installation at Northwick Park Hospital

PROJECT OVERVIEW

Generator Installation Icon
Fuel Tank

GENERATOR INSTALLATION

Two 3MVA Kohler-SDMO prime rated generators installed on-site

SOUND RESTRICTIONS

Both enclosures were designed to meet a sound level not exceeding 65dBA @ 1m. 

FUEL MANAGEMENT SOLUTION

The generators were linked with an 8 hour capacity local day tank adjacent to the container with the fuel supply connected directly to the hospital’s bulk fuel system. 

THE CLIENT

Northwick Park Hospital is a major general hospital in Harrow, Greater London, managed by the London North West University Healthcare NHS Trust. It falls within the boundaries of the borough of London Borough of Brent, in its extreme north-western corner.

 

OVERVIEW

An extensive project, the scope included the installation of two high capacity generating sets, housed in bespoke sound reduced enclosures. This scope of works also included system design, factory testing carried out at our testing facility, delivery  off load, positioning and finally, commissioning.WB Power were the principal contractor on the project, managing all aspects from start to finish. 

Northwick Park Hospital

PROJECT BRIEF

Due to the layout of the existing Hospital building and surrounding grounds, access to the generator was limited. Furthermore, there were several technical requirements within the hospitals which WB needed to fulfill in order to meet the specification. The first of these was that the new generator control system was to be designed to fully integrate with the hospital’s pre-existing building management system. The second was any solution designed should meet a sound level not exceeding 65dBA @ 1m.

 
Plant Room

SOLUTION & RESULT

WB Power Services project managed the delivery, installation and commissioning of two 3000kVA 11kV prime rated generating sets. Each housed in bespoke sound reduced enclosures, manufactured to the consultants exacting standards, with the total package fully  meeting the requirement of HTM-06.

Both enclosures were designed to meet a sound level not exceeding 65dBA @ 1m. The generators were linked with an 8 hour capacity local day tank adjacent to the container with the fuel supply connected directly to the hospital’s bulk fuel system. 

The advanced Kohler / SDMO AMP802 generator control system was designed to fully integrate with the hospital’s building management system (BMS) to provide a comprehensive  generator monitoring and duel redundant control of the HV distribution.

Kohler-SDMO generator in plant room