Description
Stage 3a engine
Four-pole circuit breaker
Connection terminal box rental type
Containment fuel tank and large autonomy
Forks and frame protection pads
Adjustable earth fault protection and earthing rod
Inlet air preheating
Battery isolating switch
Oil drainage pump
Heavy duty air filter with interchangeable cartridge
Primary filter
Heat hand protections (EC standards)
Access door to the radiator
Electronic governor with speed adjustement
For items in stock at our Derbyshire depot, we will have your generator on its way to your within one working day.
For generators not in stock, these may carry a longer lead time usually in the range of 7-10 working days.
For large industrial generators (Over 800kVA) we may require a more specialist delivery service or a form of lifting equipment at the delivery destination. Please be aware that this can involve an additional delivery charge.
If your order includes more than one item, depending on those items your order may require separate delivery times.
Please feel free to contact us before or after ordering to check delivery times for your particular order. In turn, if delivery for your order falls outside of standard delivery times and procedures, we will contact you to confirm details.