WB Power Services ltd offer a complete turnkey solution for all your generator and UPS needs. From initial consultations to investigate your specific requirements and ascertain the best solution, through to complete system design, installation and ongoing maintenance of your generators. Our design and installation teams will take care of it all. from 10 kVa to 3 mVa single or multiple units.

 

With a wealth of experience covering minor installations, right through to tender and completion of multi million pound installation and maintenance contracts for blue chip and government bodies, with WB Power Services you are assured of a team of professionals that work with your best interests in mind. And with our supply contracts and buying power, we are able to complete the entire project within budget.

 

Case Studies:

  

National Regional Water Company

New 1100kVA containerised unit for standby power for the main LV building control room plc system at a large reservoir complex. Bulk fuel tank for 1 weeks running, attenuation to 70dBA @ 1 Metre and with CO₂ fire suppression system. Controls for Peak Lopping and TRIAD and built to rigourous Water Company Specifications.

 

County Police Force Headquarters

Supply and installation of 880kVA standby unit in acoustic canopy for new communications building, 24800 litres bulk fuel tank allowing for 7¾ days operation at full load, automatic lub-oil fill system capable of supplying oil to the engine for 487 hours operation. Test and Commission.

 

NHS 

 

Supply and installation of 550kVA standby unit in acoustic canopy and within an acoustically treated plant room suitable for noise attenuation of 60dBA@1Metre outside of the plant room. 64,000 litres bulk fuel tank with Duplex pumps and panels supplying the generator and hospital boilers. Test and Commission.

 

Supply and installation of new 550kVA in acoustic canopy and 24 hours running integral base fuel tank for standby supply to the hospitals Catering Department.

 

Supply and installation of 2 new 800kVA standby power sets, bulk fuel tank with Duplex Pumps and Control Panel and for the hospitals Maternity and Oncology Departments. Sited within a plant room with attenuation and exhaust silencing together with double skinned stainless steel flue extending 30 metres outside of the plant room. Control Panels for Load Bank and Hire Set connections.

 

Supply and installation of 1100kVA standby power unit for the hospitals Central Sterile Services Department in plant room with bulk fuel tank and acoustics and exhaust system to 75dBA @ 1 Metre.

 

So whatever you project, contact one of the WB Power Services project team to ensure your needs are fully understood and met to the highest standards.

 

 

 